Aylestone Leisure Centre needed a high output solar PV system for a large flat roof and strong daytime demand. We installed an 800 panel array with a six inverter three phase setup, delivered within a three week programme with minimal disruption. Since commissioning, the site has achieved off grid operation during strong generation periods, reducing reliance on imported electricity and improving cost control.
This commercial solar PV installation for Aylestone Leisure Centre was designed specifically for a large flat roof and high daytime energy demand. The system uses 800 panels with six inverters on a three phase supply to deliver stable generation, balanced output, and long term reliability. The full install was planned and delivered within a three week window with minimal disruption to day to day operations.
Installed in phases to keep the site operating safely, with clear handover and simple performance monitoring so staff can track output and spot issues quickly.
With a focus on quality workmanship and commercial safety standards, this system was built for dependable performance year after year. Since commissioning, the site has achieved off grid operation during strong generation periods, reducing reliance on imported electricity and improving energy cost control.
The installation delivered a high output commercial solar PV system built for a flat roof environment and three phase power. With 800 panels and six inverters, the site now benefits from strong daytime generation, improved cost control, and increased energy resilience. Since commissioning, the leisure centre has achieved off grid operation during strong generation periods, reducing reliance on imported electricity and supporting long term operational savings.
Completing a large flat roof install in three weeks while keeping the centre operating safely. We had to protect the roof membrane and drainage, manage wind loading, and deliver a clean three phase electrical setup with clear isolation points for maintenance.
For commercial sites with good flat roof space, solar can cut grid reliance during daytime hours, improve cost control, and add resilience. With a three phase inverter setup, systems stay stable and can be designed for future expansion if needed.
Most projects take 2 to 6 weeks depending on roof size, access, and electrical scope.
Usually not. We phase the work and manage access so the building can keep running safely.
Yes. We use flat roof mounting designed to protect the membrane and keep drainage routes clear.
For larger commercial systems, three phase is common and helps balance load and inverter output.
Minimal. Periodic inspections, basic cleaning if needed, and monitoring checks to confirm performance.
Bespoke renewable energy installations across the UK. We install Solar PV, Battery Storage, Heat Pumps, EV Charging and Air Conditioning.
MCS Certified • RECC Member • NAPIT Approved • Finance Available
Copyright © 2026 All Rights Reserved.
Built by Stratboost